Please use the controller attached to the wall near the entrance
If no numbers are displayed on the screen :
Press the power(전원) button, then adjust the temperature using the up/down buttons
You can turn the air conditioner on/off with a remote controller
Central heating system operation period : October to April
※Heating and cooling operation may vary depending on local temperature
Hot water is provided 24 hours without requiring Heating operation.
If you are unable to use hot water after running the faucet for 5 minutes,
please contact the mobile frontdesk.