Stay Guide

[Siheung Geobukseom] Cooling, Heating, Hot water

Cooling period: May to October (not available during winter)

※ The cooling schedule may vary depending on outdoor temperature.

Heating period: November to April (not available during summer)

※ The heating schedule may vary depending on outdoor temperature.

Hot water is available regardless of the heating/cooling operation.

If hot water is unavailable, please try the following steps

  1. Bathroom sink → Open the hot water valve under the sink.

  2. Kitchen sink → Open the hot water valve under the sink.

  3. If the above steps do not resolve the issue or if assistance is needed, please contact Mobile Front.